We are continuing the construction of ladders to the Vysoké Mezipatro. We successfully extended the ladder to the level of the original working platform with a winch, which ensured the smooth transfer of loose material to the 1st floor. At this point, above the ladder's exit, we plan to build a viewing platform. Further construction will include stairs and ladders to the higher levels of the mine. On the 1st floor, we decided to move several cubic meters of material using the winch, which currently blocks part of the Roman Empire vein corridor, so that we can eventually present more exhibits, which we are actively acquiring. One of the smaller exhibits we've added to our collection is a larger diameter drill bit, shown below.