Commissioning the VV4 Drilling Rig

02/11/2020

In the meantime, we focused on commissioning the VV-4 drilling rig. We removed the hydraulic control unit from the mine and had it thoroughly cleaned and repaired. As a result, the drilling hammers' drives, among other things, are now operational. Additionally, we are converting the originally wooden ventilation wall at the fan room to a brick one to facilitate easier mine ventilation after blasting demonstrations. We have acquired an original refractory furnace, which was used to melt gold pieces at the end of the processing stage. The furnace will be part of the newly constructed exhibit dedicated to mining processing.